Electrical Wiring Installation from Scratch

New wiring on the island is not just about running cables, but about creating a protected system resilient to the aggressive environment. Humidity above 80%, salt spray, and constant load from air conditioners require the use of specialized materials and technologies, as specified in the TEC 2026 standard. Our engineers design and install electrical networks that are not only safe but also certified for insurance purposes.

Mandatory TEC 2026 Requirements for New Installations in Phuket:

  • Cables: Copper only. Use of NYM, VAF-G, or THHN/THWN-2 in PVC conduit. Cross-section: 2.5 mm² for sockets, 4 mm² for air conditioner lines, 6 mm² for water heaters and electric stoves.

  • Protection: In the distribution board — RCBO (Residual Current Breaker with Overcurrent protection) on each circuit. Additionally — SPD (Type 2) at the main input for protection against lightning surges.

  • Grounding: Mandatory TT system loop with a grounding electrode and resistance < 5 Ohms. Complete separation of neutral (N) and earth (PE).

  • Circuit Distribution: Division into groups: lighting (1-2 groups), general sockets (3-4 groups), kitchen (separate group), air conditioners (each on its own circuit), water heater (separate circuit).

Installation Process for Different Property Types:

1. Condominium (Patong, Kata, Karon):

  • Approval: Obtaining permission from the Juristic Person Office for panel placement and conduit routing.

  • Installation: Running cables in technical ducts or skirting boards. Installation of an apartment Surface Mounted Box. Minimal wall chasing.

  • Feature: Use of FR (Flame Retardant) cable.

2. Private Villa (Surin, Bang Tao, Kamala):

  • Design: Development of a Single Line Diagram.

  • Installation: Wall chasing, running cables in conduit, installation of flush-mounted back boxes and a Flush Mounted Panel.

  • Additionally: Organizing the connection for solar panels, low-voltage pathway for Smart Home.

3. Commercial Property (Hotel, Restaurant):

  • Calculation: Cable sizing based on load, voltage drop calculation.

  • Installation: Three-phase supply, cable routing in Cable Trays, installation of Distribution Boards.

  • Standard: NYY cables with double insulation.

Brief Work Process:

  1. Audit and Design: Measurements, load calculations, plan approval.

  2. Marking and Chasing: Route marking with a laser level, chasing with diamond tools.

  3. Cable Laying: Placing cables in conduit, securing.

  4. Panel Assembly: Mounting circuit breakers, RCCBs, busbars, labeling.

  5. Fixture Installation: Installing back boxes, sockets, switches.

  6. Commissioning: Insulation testing, protection device operation check, grounding measurement.

  7. Certification: Issuance of an Electrical Safety Certificate.

Materials Used (Brands):

  • Cables: Bangkok Cable, Nexans

  • Panels and Circuit Breakers: Schneider Electric, ABB, Legrand

  • Terminals: WAGO

Our engineers are licensed electricians with PEA and TISI certifications. We operate across all of Phuket.